当前位置:工程项目OA系统 > 建筑OA系统 > 工程项目管理软件系统
浅谈区域环境的影响
论文摘要:实行对外开放政策以来,我国在沿海省市开辟了一系列新经济开发区。这些经济区一般都有各自的经济发展规划,有的制定了区域环境规划,因此,应该开展相应的区域环境影响评价。
Abstract: since the adopted a policy of opening to the outside world, our country started a series of new economic development zone in coastal provinces and cities. These economic zones generally has its own economic development planning, some established regional environmental planning, therefore, the corresponding regional environmental impact assessment should be carried out. 论文关键词:区域环境评价;新经济开发;REIA;污染物预防 Key words: regional environmental assessment; The new economic development; REIA; Pollution prevention 一、区域环境评价的概念 First, the concept of regional environmental assessment 从1979年中国实施建设项目环境影响评价制度至今,其相关制度在保护自然环境、防治污染、协调开发建设和环境保护方面就一直发挥着重要的作用。经济建设的迅猛发展,带动了众多区域性开发建设项目的发展,例如经济开发区、高新技术产业开发区、旅游度假区及边贸开发区等,使多个建设项目在相同地区,相近时间陆续开展。届时,如果对各建设项目进行逐个环境影响评价(EIA),就不能准确预测最终的环境变化,不能显示区域开发的总体环境影响,进而导致无法采取合理的环境保护对策,使环境质量目标的实现落空。故而,应当将这类开发建设项目看作一个整体,综合考虑全部区域开发的建设行为,开展区域开发环境影响评价,即区域环境影响评价(REIA)。从理论上说,REIA可归入战略性环境影响评价(SEIA或SEA)的范畴。 From China in 1979 since the implementation of the construction project environmental impact assessment system, the related system in protecting the natural environment, prevent and control pollution, to coordinate development and environmental protection has been playing an important role. The rapid development of economic construction, promote the development of the regional development and construction projects, such as economic development zone, hi-tech industry development zone and tourist resort and the border trade development zone, etc., make many construction projects in the same area, close to the launch time. Then, if individually for each construction project to the environmental impact assessment (EIA), will not be able to accurately predict the ultimate environmental change, can't display area development's overall environmental impact, leading to not take reasonable environmental protection countermeasure, failed to achieve the goal of environmental quality. So, this kind of development and construction project shall be as a whole, taking into account all the construction of regional development, regional development environmental impact assessment, namely, regional environmental impact assessment (REIA). In theory, REIA can be classified as strategic environmental impact assessment (SEIA or SEA).- 1安徽造价工程师资格考试时间
- 2建筑安装工程直接费中的措施费主要有什么
- 32015年招标师考试专业实务:招标的适用范围
- 42015年造价工程师考试《安装》:砖墙砌筑的基本要求
- 5泵送C50F200W4混凝土配合比设计与质量控制
- 6有效控制与管理工程变更
- 7机械最新推出的“绿色商品混凝土搅拌站”受到万人注目
- 8现制水磨石地面施工作业条件
- 92011年资料员《基础知识》考试模拟试卷
- 102013年一级建造师《工程经济》每日一练(11.28)
- 11常州青龙生活区项目设计策划案
- 122015年一级建造师《建设工程项目管理》每日一练(3.1)
- 13麦可笔手绘图图集-2
- 142015年工程造价案例分析教材知识点归纳:专利技术
- 15河南省关于未参加2008年造价员续期教育人员的通知
- 16西安某遗址公园古建筑施工组织设计
- 17招标师法规辅导:开标相关知识
- 18采购案例分析复习指导(58)
- 19某街道排水及雨污水管道工程施工组织设计
- 202015年一级建造师法规及相关知识辅导资料:诉讼
- 21屋顶绿化特征
- 22监理工程师每日一练免费在线测试(2015.5.12)
- 23项目管理:供应商管理
- 242015年安全工程师备考指南
- 25监理工程师每日一练免费在线测试(2015.3.5)
- 26电气工程电缆敷设冬季施工方案
- 272015招标师考试辅导资料:与承包有关的法律规定
- 28等截面与不等截面板式换热器应用于供热技术对比分析
- 292015年招标师考试辅导资料:熟悉政府采购法
- 30建筑材料检测行业存在的问题及解决对策
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼