2005年上半年信息项目管理师试卷5
This method includes following types of dependcies orprecedence relationships:
___(67)___the initiation of the successor activity, depends upon the completion of the predecessor activity.
___(68)___the initiation of the successor activity, depends upon the initiation of the predecessor activity.
(66) A.PDM B.CPM C.PERT D.AOA
(67) A.F-S B.F-F C.S-F D.S-S
(68) A.F-S B.F-F C.S-F D.S-S
● estimating schedule activity costs involves developing an ___(69)___ of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives.for example,in mostapplication areas,additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estmates are generally expressed in units of ___(70)___ to facilitate comparisons both within and across projects. the ___(71)___ describes important information about prject requirement that is considered duing cost estimating.
(69) A.accuracy B.approxination C.specification D.summary
(70) A.activity B.work C.currency D.time
(71) A.project scope statement B.statement of work
C.project management plan D.project policy
● The ___(72)___ technique involves using project characteristics in a mathematical model to predict total project cost.models can be simple or complex.
(72) A.cost aggregation B.reserve analysis
C.parametric estimating D.funding limit reconciliarion
● ___(73)___ is ameasurable, verifiable work poduct such as specification.feasibility study report, detail document, or working prototype
(73) A.milestone B.deliverable C.etc D.BAC
● ___(74)___ are individuals and organizations that are actively involved in the project, or whose interests may be affected as aresult of project execution or project completion; they may also exert influence over the project and its results.
(74) A.controls B.baselines
C.project stakeholders D.project managers
● ___(75)___ is the process of obtaining the stakeholdrs’formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
(75) A.project acceptance B.scope verification
C.scope definition D.WBS Creation
- 1一级建造师复习资料:建设准备
- 22009年二级建造师《法规及相关知识》习题四十
- 3浅谈烟囱简体电动升模施工专项安全技术措施
- 4京津冀首条城际铁路年内开工:1小时交通圈
- 5首座高速公路双层高架特大桥在陇南武都建成
- 6西成客专阜川隧道出口安全开挖突破300米
- 7上海2015年的招标师报名时间确定了吗
- 8定向降准精准滴灌术跑偏:中小企业仍一贷难求
- 92013年一级建造师《建筑工程》考前测试题3
- 102015造价员考试须注意的细节问题
- 11路基路面现场检测方法详解187页(PPT)
- 12现有建筑物安全度的模糊综合评定
- 13一级注册消防工程师技术综合试题:施工过程质量控制要求
- 14水泥稳定碎石基层施工指导
- 15合肥市今年实施7000户农村危房改造
- 16浅析清水混凝土处理的四个控制环节
- 17黄土隧道锚杆支护研究报告56页(PPT 著名教授)
- 18上海某建筑工程检测与试验方案
- 19共同承包的资质要求有哪些
- 20项目管理之项目管理中应注意的重点
- 21安全工程师《管理知识》复习资料:按评价结果的量化程度分类
- 22广西规范污泥处理标准 禁止利用未达标污泥
- 23河畔工程施工组织设计
- 24咨询工程师考试《宏观经济政策与发展规划》考点解析(二)
- 25国家注册监理工程师的考试资格
- 26地下室热熔铺贴卷材施工工艺
- 27BOT方式在土耳其的应用
- 28某植物园改造工程施工方案98p
- 29中铁二局贵安项目文明施工精细化管理受好评
- 30广元全国安全工程师资格考试辅导班/广元安全工程师资格考试培训班
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼