PMP认证考试试题精选(6.3)
a. statement of work.
b. payment schedules.
c. formal acceptance.
d. change control process.
31. The process of performance reporting includes all of the following except:
a. status reporting.
b. progress reporting.
c. forecasting.
d. product analysis.
32. Constructive team roles include:
a. investigator, clarifier, and closer.
b. compromiser, blocker, and closer.
c. initiator, encourager, and gatekeeper.
d. investigator, recognizer, and summarizer.
33. Which of the following statements concerning contract type is correct?
a. fixed price contracts offer buyers the highest potential risk.
b. cost reimbursable contracts offer buyers the lowest potential risk.
c. fixed price contracts are illegal in most regulated industries.
d. lump sum contracts offer sellers the highest potential risk.
34. A Work Breakdown Structure numbering system should allow project staff to:
a. identify the level at which individual WBS elements are found.
b. identify configuration management milestones.
c. estimate the costs of WBS elements.
d. provide project justification.
35. All of the following are true quality statements except:
a. Computer-aided design systems can improve quality, but only at the expense of an increase in the cost of design.
b. Project quality management must address both management of the project and the product of the project.
c. Recognition of key actions required of each team member is necessary to meet quality objectives.
d. Quality improvement depends upon better definition and increased awareness of the requirements/specifications.
36. A project was estimated to cost .5 million and scheduled to last six months. After three months, the earned value analysis shows the following: EV = 0,000, PV = 0,000, and AC = 0,000. The schedule and cost variances are:
a. SV = -0,000 / CV = -0,000.
b. SV = -,000 / CV = +0,000.
c. SV = +0,000 / CV = +0,000.
d. SV = +0,000 / CV = -0,000.
37. A precise summary of a physical item, procedure, or service for implementation of an item or service is called a:
a. work package.
b. baseline description.
c. product description.
d. work breakdown structure.
38. All of the following are examples of tools often used in cost estimating except:
a. parametric modeling.
b. duration estimating.
c. bottom-up estimating.
d. analogous estimating.
39. The most crucial time for project risk assessment is:
a. when a problem surfaces.
b. during the planning phase.
c. during the close-out phase.
d. after the schedule is published.
40. Inputs used during scope planning include all of the following except:
a. constraints.
b. project charter.
c. budget/cost analysis.
d. product description.
41. A scope statement is important because it:
a. provides the basis for making future project decisions.
b. provides an executive summary of the project for sponsors.
c. documents approval of the project for the stakeholders.
d. provided criteria for measuring total project cost.
- 1项目管理工具
- 2建筑工程项目管理软件
- 3工程项目管理软件系统
- 4开源项目管理软件
- 5项目管理软件下载
- 6重庆建筑施工项目管理系统开发
- 7工程项目管理软件下载
- 8多项目管理
- 9项目管理系统
- 10好用的项目管理
- 11企业项目管理排名
- 12项目管理软件
- 1关于公布第二批“中国工程建设管理咨询顾问”名单及相关事宜的通知
- 2一级建造师考试资料:节能管理
- 3某水厂水源转换方案
- 4某住宅1、2、3#楼工程施工组织设计136P
- 5某清淤工程施工组织设计87p
- 6发挥华东地区智能建筑优势――迎接加入WTO挑战
- 7面向对象方法在需求分析中的应用
- 8网架修缮脚手架搭设实例两则
- 92015年造价工程师考试《技术与计量》课本浓缩精华(46)
- 10智能建筑为何不智能?
- 112015年监理工程师考试《理论与相关法规》试题(7)
- 12当代主要建筑思潮与流派
- 13外墙保温材料的性能指标有哪些?
- 142015年监理工程师《进度控制》每日一练(10.12)
- 15投药气浮-UASB-SBR工艺处理淀粉废水
- 16液压自爬模模板施工工艺及在超高层建筑应用实例(附图)
- 17在建酒店挖四层地下室 周围居民希望制定赔偿方案
- 18商品混凝土搅拌站配合比为什么得不到施工工地认可
- 19预应力锚索张拉时应控制哪些工序质量?
- 20造价工程师案例分析复习要点:涨价预备费公式
- 21招标师2015专业知识与法律法规提分试题(4)
- 222015年一建建设工程基本法律知识:买卖合同债
- 232014年一级建造师《项目管理》每日一练(1.8)
- 24天津将采用eFIDIC实现对公路工程建设信息化管理
- 252015年监理工程师:新增其他资产
- 2619天建57层高楼 承建方是这样回应的!
- 27用“超级连接”快速跳转到其它文件
- 28一级建造师复习资料:金属切削机床的性能
- 29二级建造师建筑工程复习要点:钢筋搭接
- 302015年造价工程师考试《计价与控制》学习指导(16)
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼