PMP认证考试练习题(十二)(中英文)
1. The project plan is a document designed to tell__________ exactly what should be happening in a given
period of time.
Anyone associated with the project
The project manager
The functional manager
The client
项目计划是设计用于向____确切描述在给定时段将发生情况的文件.
任何与项目有关的人
项目经理
职能经理
客户
2. In which process group do we identify human and non-human resources required for a project?
Initiating
Executing
Planning
Controlling
Closing
在哪一个过程组中我们可确定项目所需的人力和非人力资源?
立项
实施
计划
控制
收尾
3. Feasibility studies are performed in the ______ process group of the project.
Initiating
Executing
Planning
Controlling
可行性研究在项目的____过程组实施?
立项
实施
计划
控制
4. In which process group do we examine alternative ways of accomplishing project objecties?
Initiating
Executing
Closing
Planning
Controlling
我们在哪一个过程组调查实现项目目标的不同途径?
立项
实施
收尾
计划
控制
5. In which process group do we transfer resources to other systems?
Initiating
Executing
Controlling
Planning
Closing
在哪一个过程组我们将资源转移到其他系统?
立项
实施
控制
计划
收尾
6. Your bowling alley business has exploded ever since you introduced a “dating service league. Accordingly, you need to build another facility and have assembled an invitation for bid (IFB) package with all the necessary descriptions of the required supplies, equipment, and services. You are convinced that the IFB. Will result in equal and fair competition among all sellers. You want to avoid any confusion regarding the work to be performed because you probably will not conduct negotiations with the sellers; however, you may or may not award the contract to the lowest-bidding seller, and you have made this clear in the IFB. In this situation, you should be prepared to
a . Prohibit sellers from attending the bid opening because you will need time to decide to whom to award ontract
b. Document your award decision as completely as possible to all sellers
c. Inform the seller who won the bid and indicate to the others that no further discussion will take place on this issue
d. Limit the sellers who will receive the IFB to reduce conflict
自从你引入“年代测定服务”联盟以来,你的保龄球道业务有了很大的发展. 因此,你需要再建造一套设施,并已经准备好了一套包括你所需的全部必?垢?⑸璞负头?衩枋鲈谀诘耐侗暄?耄↖FB)会为所有供应商提供公平的竞争机会. 你接下来的工作中你想要避免任何的混乱,因为你可能不能控制和供应商的谈判. 然而你既可以把这份合同交给报价最低的投标供应商来做,也可以不交给他们做,这些也都在投票邀请IFB中交待清楚了. 在这种情况下,你应该在下列哪个方面做好准备.
因为你需要时间考虑把合同交给哪个供应商做,所以要阻止供应商参加公开的投标
向所有的供应商尽可能全面地说明你的合同授予决定
通知赢得合同的供应商并向其他供应商说明在这个没有再进一步讨论的余地了
向有限的供应商发放IFB以冲突
7. Your team is working on an international project to build a regional cellular network in a small, mountainous country. After 10 days of work, a major political activist is killed in an unfortunate hang gliding accident. His death leads to mass riots throughout the country. Work cannot continue, and your team returns home. A risk such as civil unrest typically requires
Upfront risk management planning with continual review of the plan throughout the project life cycleDisaster recovery actions instead of risk managementPeriodic risk audit and project risk reviews A repository or risk database to be established as the basis of a risk lessons learned program
你的团队正在一个多山的小国家从事一个地区性小型网络建设的国际项目. 在工作了10天之后,一个主要的政治激进分子在一次不幸的悬挂物下滑的意外事故中丧生了. 他的死亡在这个国家引发了全国性的群众暴动. 工作无法继续进行下去,你的团队也回国了. 像社会动荡这样的风险一般要求要在整个项目生命周期中不断回顾计划的进展,以此来把风险管理计划摆在第一位用灾难补救的行为来代替风险管理周期性的风险审计和项目风险评估建立一个知识库或风险数据库,以此作为由项目中吸取遭受风险的经验教训的基础
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 12015年咨询工程师《现代咨询方法与实务》练习题(16)
- 2【招标师考试】项目管理与招标采购第二章:工程建设项目合同管理
- 3二级复习资料脚手架常见的设计施工问题
- 4湖南某住宅主体施工阶段平面布置图
- 52015年土木工程复习资料—防水工程
- 62015造价员《安装工程》热力安装:层铺式结构炉衬
- 7西藏:2013年交通投资220亿 新增公路5000公里
- 8《政策与规划》知识点:我国政府采购制度的概念以及基本内容
- 9造价员考试睡眠减压法
- 102015年造价员基础知识:钢筋验收
- 11决策与分析考点:土建工程方法设计
- 12小型混凝土搅拌车的维护注意事项
- 132015年咨询工程师《工程咨询概论》每日一练9.22
- 142015造价员《安装工程》知识点:临时设施措施费
- 152015年二级建造师《建筑》:订立劳动合同的条件
- 16一级建造师管理与实务复习要点:钢筋数量
- 17某纸业公司废水处理方案 30p
- 18安全工程师生产法复习资料——预阶段
- 192015年咨询工程师《宏观经济政策与发展规划》每日一练(4.29)
- 202015年招标师考试招标采购专业实务考前复习指导(86)
- 21工程咨询概论知识点:我国注册咨询工程师含义
- 22招标师考试的课程辅导
- 232015.5.12咨询工程师每日一练免费在线测试
- 242015年安全工程师《相关法规》模拟训练(2)
- 25清水池施工方案
- 26搭设和拆除作业中的安全防护
- 272015年安全工程师考试《安全生产技术》全真试题(7)
- 28云南征订注册消防工程师资格考试辅导教材的通知
- 292010年pmp美国项目管理考试项目沟通管理练习题及答案4
- 30水泥防滑路面人工拉毛施工
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼