PMP认证考试练习题及参考答案(五十五)
A Demand forecast
B Price forecast
C Supply forecast
D Production forecast
E None of the above.
ans:B
2 Fixed-price and incentive-type contracts place responsibility for performance and financial risks associated with delay or non-performance on the:
A Buyer
B Third party
C Contractor
D All of the above
E None of the above
ans:C
3 The _____ specification delineates specific measurable capabilities or parameters for which a product can be tested as part of the acceptance procedure.
A Performance
B Functional
C Technical 考试大-全国最大教育类网站(www.Examda。com)
D Base Line
E None of the above.
ans:A
4 There are four methods of government procurement. Which is not one of these methods?
A Assistance
B Sealed bidding
C Competitive proposals
D Acquisition
E Small purchases
ans:D
5 Which is not a consideration in a make or buy decision?
A Cost factors (least cost alternatives)
B Competitors' method of sourcing
C Existence of sufficient administration/technical personnel
D Political and social factors
E None of the above.
ans:B
6 By which means is a contractor able to control cost overruns due to changing requirements?
A Project data review
B Change order
C Purchase order amendment
D Change control
E None of the above.
ans:D
7 _____ is a formal invitation containing a scope of work which seeks a formal response (proposal) describing both methodology and compensation to form the basis of a contract.
A Request for proposal
B Invitation to bid
C Request for quotation
D Intention for bid
E None of the above.
ans:A
8 _____ is a method of procurement where a contract results from a bid which may be changed through bargaining.
A Acquisition
B Contract negotiation
C Procurement
D Purchase negotiation
E None of the above.
ans:B
9 _____ is a narrative description of the work to be accomplished or resource to be supplied.
A Purchase order
B Level of effort work
C Scope of work
D Contract stipulation 考试大-全国最大教育类网站(www.Examda。com)
E None of the above.
ans:C
10 The cost of corrective action taken by the purchaser and chargeable to the supplier under the terms of the contract is:
A Payment authorization
B Bid cost considerations
C Release payment
D Back charge
E None of the above.
ans:D
11 Cost Reimbursable contracts are equivalent to:
A Cost plus contracts
B Fixed plus contracts
C Progress payment contracts
D Back charge contracts
E None of the above.
ans:A
12 Which is not part of the purchasing cycle?
A Defined need
B Transmit need
C Inspection
D Prepare and issue purchase order
E A and D
ans:C
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1一年花事完全手册
- 2安全工程师考试《法律法规》习题班讲义精选(176)
- 32012一级建造师《项目管理》:建设工程合同类型
- 4花岗岩铺装工程施工组织设计51p
- 5城市道路工程施工方案的技术经济分析
- 6磁悬浮轨道梁精密调位施工工法
- 7关于EPC模式与项目总承包模式承包范围的说法,正确的是
- 8正确利用及保养搅拌车要领
- 9搅拌车保养的小窍门
- 10道路园林绿化、路灯、交通标志施工方案135p
- 112013年二级建造师《施工管理》知识点整理:规费
- 122015年果洛造价工程师考试用书
- 13二建复习资料砂浆配合的选择
- 142013年二级建造师《施工管理》每日一练(11.7)
- 15经济合同变更、解除使一方受损失,如何赔偿
- 16工程造价和审计咨询两行业转型发展须抓两手
- 17分包工程开工后施工情况进行监督检查 内容
- 18关于安全生产技术真题的一个问题
- 19附墙式外挂脚手架应用与改进措施
- 202015年咨询工程师《项目决策分析与评价》每日一练8.6
- 212010年PMP美国项目管理考试习题及答案31
- 222015年监理工程师考试《工程合同管理》模拟题(3)
- 23一级建造师管理与实务复习要点:焊接连接
- 24北京:石景山两重点村回迁房八成开建
- 252015年注册安全工程师事故案例分析模拟试题(十九)
- 26招标师职业水平考试:招标采购专业实务第九章练习题9
- 27一级建造师管理与实务复习要点:签发签证问题
- 28提高产品价值的途径
- 29《土建工程》知识点:进口设备的构成
- 30给排水安装基础与识图161P
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼