PMP认证考试练习题及参考答案(四十九)
1 The project manager that allows and supports group discussions and decision making is called a(n) _____ manager.
A autocratic
B consultant autocratic
C consensus
D shareholder
E None of the above.
ans:C
2 Power games, withholding information, and hidden agendas are examples of-.
A noise
B communication barriers
C indirect communication
D mixed messages
E All of the above
ans:B
3 The main player in project communication is the
A sponsor
B project manager
C functional manager
D functional team
E All of the above.
ans:B
4 A recurring communication pattern within the project organization or company is called a:
A free-form matrix
B structured matrix
C network 来源:www.examda.com
D rigid channel
E None of the above.
ans:C
5 An informal communication network on a project and within an organization is called a(n):
A free upward flow
B free horizontal flow
C unrestricted communication flow
D grapevine
E open network
ans:D
6 Your sponsor announce to you and your team that his/her door is open to everyone wishing to discuss project problems. Yet, the sponsor seems to be annoyed whenever someone does stop by, even when discussing a serious problems. This is an example of.
A semantics
B credibility
C inconsistent signals
D perceptual differences
E misunderstood role
ans:C
7 Managers who adopt a sound, but prudent managerial style are called
A authorization
B conciliatory
C ethical 来源:考试大网
D judicial
E promotional
ans:D
8 Sound, prudent, but often unsophisticated judgement is called:
A common sense
B rational management
C smoothing
D confrontation
E None of the above
ans:A
9 Which of the following is least likely to be used in explaining to a team member why you consider his/her performance substandard?
A Project office memo
B counseling session
C project team meeting
D formal letter
E individual conversation
ans:C
10 For every situation, several methods usually exist for effective communication to take place. Which of the following is least likely to be used for explaining to the team project planning guidelines?
A project office memo
B project office directive
C project team meeting
D formal report
E counseling sessions
ans:D
11 A project team member submits a suggestion on how to improve the corporate procurement process. This is an example of _____ communication
A upward
B downward
C horizontal
D diagonal
E None of the above.
ans:A
12 Job descriptions are examples of ______communications.
A upward
B downward
C horizontal
D diagonal
E None of the above
ans:E
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1铁水贮运和预处理设施安全规定
- 2安全工程师考试《法律法规》习题班第八讲讲义(13)
- 32015年和田造价工程师报名缴费时间及费用
- 4安全工程师《法律法规》知识要点:安全生产标准种类1
- 5河南省2008年造价工程师报名时间/报名地点/报名条件讨论区
- 6建筑施工阶段沉降观测怎么做?
- 72015招标师考试项目管理考点:项目进度管理体系
- 860平台湾老屋改造“杂志”北欧家居设计
- 92015监理工程师《基础理论与相关法规》强化训练(十)
- 102015年咨询工程师考试《工程项目组织管理》模拟题(45)
- 112012一级建造师《公路工程》:桥梁上部结构支架施工方法
- 12工程项目组织与管理知识点:过程控制管理
- 132015年安全工程师《安全生产法及相关法律知识》每日一练(4.20)
- 14洛杉矶“全混凝土粗犷风”Line酒店 粗犷精致并存
- 15一级建造师管理与实务复习要点:暗标
- 16基于逆向工程的转子发动机关键件设计
- 17国家发改委关于注册安全工程师收费标准的通知(考试介绍)
- 182015年咨询工程师《宏观经济政策与发展规划》每日一练3.3
- 19一级建造师工程经济复习要点:等额偿还
- 202015年造价工程师《计价控制》第二章讲义(10)
- 21园区广场工程施工组织设计62p
- 222015年安全工程师《生产技术》:水运交通危险有害因素
- 232015年安全工程师《管理知识》:生产性粉尘作业分级
- 24安全工程师生产技术复习要点:电阻
- 252015年咨询工程师《宏观经济政策与发展规划》每日一练7.21
- 262015年招标师考试学习资料:工程建设项目的投融资管理
- 27韶关市2015年安全工程师考试报名时间为4月13日至5月14日
- 28武汉豪宅业主深挖车库 改建三室三厅地下居室
- 292015年咨询工程师《组织与管理》每日一练(6.18)
- 30高层框架结构办公楼防水工程施工方案
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼