PMP认证考试练习题及参考答案(三十九)
1 The Japanese Quality Control (QC) Circle movement motivated its participants in many ways. Which of the following represents the most important motivation for the QC circle participants?
A improving the performance of the company
B self-improvement
C financial incentives
D recognition among co-workers
E strengthening of relationships between co-workers
ans:A
2 The Pareto Principle is a technique used by quality managers to determine which quality control problems of a particular service or manufacturing process should be corrected. Which of the following statements represents the philosophy of the principle?
A In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected.
B the majority of defects are caused by a small percentage of the identifiable problems. Improvements efforts should be reserved for these vital few problems.
C in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.
D generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.
E A and D 来源:考试大
ans:B
3 A process characteristic has a true mean of 150 and a true standard deviation of 20. A sample of 25 items is taken from this process. The standard error of the estimate is:
A 0.2
B 0.8
C 4
D 5
E 7.5
ans:C
4 Quality attributes
A are used to determine how effectively the organization accomplishes its goals
B can be objective or subjective in nature
C are specific quality characteristics for which a product is designed, built, and tested.
D A and B.
E B and C
ans:E
5 A proven effective means to insure quality conformance is to:
A delegate accountability to subordinates
B revise quality specifications to match quality measurements
C train workers in proper quality methods
D inspect quality into the product 来源:www.examda.com
E make quality a higher priority than cost or schedule
ans:C
6 What is the relative priority of project Cost, Schedule and Quality?
A 1)Cost - 2)Schedule - 3)Quality
B 1)Quality - 2)Schedule - 3)Cost
C 1)Quality - 2)Cost - 3)Schedule
D 1)Schedule - 2)Quality - 3)Cost
E All are of equal priority
ans:E
7 The quality objectives are approved in the conceptual stage of the project by the:
A Project Engineer
B Project Manager
C Functional Manager
D Quality Assurance Manager
E Project Owner
ans:E
8 Of the following, who has the ultimate responsibility for meeting project quality objectives?
A Project Engineer
B Project Manager
C Functional Manager
D Quality Assurance Manager
E Project Owner 来源:www.examda.com
ans:B
9 Utility Theory:
A considers the risk propensity of the decision makers.
B is based on proven statistical methods.
C deals with the usefulness of the end product.
D is a key element of ISO 9000
E B and C
ans:A
10 The Risk of NOT meeting project quality objectives:
A can be minimized through continuous monitoring.
B considered a long term risk.
C will be reflected in the "in-service" life of the product or service.
D B and C
E All of the above.
ans:E
11 The "zero defect" concept was proposed by:
A Deming
B Juran
C Crosby
D Tagushi
E A and D only
ans:C
12 The use of quality circles:
A has proven ineffective in both Japan and the U.S.
B is particularly effective in overcoming labor/management conflicts.
C provides a quick fix for most quality problems.
D allows workers the opportunity to generate solutions for chronic quality problems.
E A and B only
ans:D
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1园林图块(二)
- 2安庆2015年安全工程师考试5月24日至6月9日报名
- 3安全工程师答疑精华:电焊机类别
- 4招标师职业水平考试:项目管理与招标采购第一章练习题11
- 5合肥高铁南环线将串联合蚌与合福铁路 十月全线铺轨
- 62013年二级建造师《施工管理》考前复习资料(10)
- 7《招标采购法律法规与政策》第三章:使用国际组织资金的项目
- 8信息系统项目的范围管理
- 9《招标采购法律法规与政策》第三章:明确招标文件的售价
- 10锚杆基本试验有哪些目的?
- 11园林植物造景原则
- 122015造价员考试建设项目施工图预算知识:施工图预算的内容
- 13咨询工程师《咨询概论》要点:工程咨询评估
- 14安全工程师安全生产法复习资料——烟花爆竹批发企业的条件
- 152015招标师考试:招标采购专业实务详解3
- 16[重庆]07造价工程师考试5.14起报名
- 17论外墙涂料施工采用的吊篮施工技术
- 18冬季施工方法
- 192015年咨询工程师《项目决策分析与评价》每日一练3.13
- 20《政策与发展规划》知识点:信托投资公司
- 21北京市长表态:不会轻易出台新的房地产政策
- 22《现金咨询方法与实务》知识点:单代号绘图法
- 23工程咨询概论知识点:处罚条款
- 24二级建造师考试复习总结:路基雨期施工技术
- 25安全工程师答疑精华:义务
- 26祁连机场建前工程破土动工 海拔3000米左右
- 272015年富阳市造价工程师考试报名时间为6月16日至30日
- 282015.5.26咨询工程师每日一练免费在线测试
- 29某江滨绿廊工程施工组织设计方案
- 302015年咨询工程师《项目决策分析与评价》每日一练(1.15)
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼