PMP认证考试练习题及参考答案(四十四)
A Confrontation
B Compromise
C Smoothing
D Forcing 来源:www.examda.com
E Withdrawal
ans:A
2 Formal authority is often referred to as legitimate power. Which two other forms of power are also considered to be legitimate power?
A Reward and penalty
B Reward and referent
C Referent and expert
D Expert and reward
E Penalty and referent
ans:A
3 In the past, most project managers have come from _____ fields without proper _____ training or education in skills
A Technical; accounting/finance
B Technical; management
C Technical; psychological
D Marketing; technology-oriented
E Business; manufacturing know-how
ans:B
4 Project managers need exceptionally good communication and negotiation skills primarily because:
A They may be leading a team over which they have no direct control
B Procurement activities mandate this
C They are expected to be technical experts 来源:www.examda.com
D They must provide executive/customer/sponsor briefings
E All of the above
ans:A
5 The major difference between project and line management is that the project manager may not have any control over which basic management function?
A Decision-making
B Staffing
C Rewarding
D Tracking/monitoring
E Reviewing
ans:B
6 A good team leader must be concerned not only with _____ but also with _____ .
A Long term goals; short term goals
B Organizational goals; personal goals
C Legitimate power; referent power
D Group efficiency; power and authority
E Tasks to be accomplished; needs of the team members
ans:E
7 In small companies, project managers and line managers are:
A Never the same person
B Always the same person
C Sometimes the same person
D Always in disagreement with each other
E Forced to act as their own sponsors
ans:C
8 A project manager who allows the team to make the majority of the decisions is demonstrating a(n) ____ leadership style.
A Laissez-faire
B Boss-centered
C Subordinate centered
D Autocratic
E Demographic
ans:C
9 R & D project managers in high-tech companies most often motivate using _____ power.
A Expert
B Reward
C Referent
D Identification 来源:考试大
E None of the above
ans:A
10 Charisma would be an example of _____ power.
A Legitimate
B Reward
C Coercive
D Expert
E Referent
ans:E
11 Which of the following types of power comes through the organizational hierarchy
A Coercive
B Reward
C Referent
D Legitimate
E Expert
ans:D
12 An example of coercive power would be:
A Demotion
B Reduction in wages
C Disciplinary layoff
D Reprimand
E All of the above
ans:E
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 12015年注册安全工程师事故案例分析模拟试题(十四)
- 22015年招标师:招标采购实务模拟试题14
- 3聚乙烯丙纶复合防水卷材施工工艺
- 4项目管理与招标采购第二章:建设工程项目履行合同的担保形式
- 5安全工程师考试《法律法规》习题班讲义精选(50)
- 62015招标师考试:招标采购专业实务详解(第三章)汇总
- 7安全工程师《生产管理》自测题(26)
- 82015年咨询工程师《项目决策分析与评价》每日一练12.19
- 92015年监理工程师《建设工程合同管理》练习题(83)
- 102015年安全工程师《管理知识》资料:民事责任
- 112015年咨询工程师《工程咨询概论》考试模拟试题(9)
- 122015年咨询工程师《宏观经济政策》练习题(46)
- 132015年招标师:招标采购实务模拟试题20
- 14涓夌淮鏂藉伐鐜板満骞抽潰璁捐?搴旂敤
- 152015招标师考试顺利开考(图文报道)
- 162015年安全工程师生产管理知识模拟精选(11)
- 17IPMP面试必读:评估师
- 18岩土工程师答题技巧
- 19深化设计管理
- 20工程监理单位应遵守的基本原则之一是什么
- 21项目投标合同文本制定 内容
- 22竹网—土工布处治软基
- 23某大桥承台大体积砼的施工
- 24全站仪在工程变形监测中的应用
- 252015年白山造价工程师报名时间
- 26土钉墙在边坡加固防护中的应用
- 272015年咨询工程师《工程项目组织与管理》每日一练12.15
- 282015年二级建造师《法规及相关知识》每日一练(6.21)
- 292015年安全工程师考试《管理知识》:安全评价业务分类
- 302011年PMP考试试题分布更新通知
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼