PMP认证考试练习题及参考答案(三十八)
A 10-12%
B 2-3 %
C 6-8%
D 3-5%
E more than 15 %
ans:D
2 _____ of the extra costs of the project can often be attributed to a lack of quality.
A 12%
B 15%
C 20%
D 25%
E less than 10% 来源:考试大
ans:C
3 CIP embodies which of the following principals?
A constancy of purpose
B customer focus and involvement
C total involvement
D teamwork
E All of the above.
ans:E
4 The key ingredient to a successful quality management program are _____.
A management's quality philosophy, operational quality assurance and operational quality control.
B quality evaluation methods and functional quality integrators.
C technical quality administration, the technical quality specifications, and the quality process review.
D quality evaluation methods, quality progress reviews and the technical quality specifications.
E All of the above.
ans:A
5 At least _____of the cost of quality are the direct responsibility of management.
A 25%
B 85%
C 50%
D 100%
E 33%
ans:B
6 Non-conformance penalties are a form of _____.
A quality incentive
B risk sharing
C contract negotiations
D quality assurance programs
E None of the above. www.Examda.CoM
ans:C
7 Quality Improvement Programs are normally associated with which two of the following?
A Juran and Crosby
B Juran and Deming
C Crosby and Deming
D Deming and the Japanese
E Crosby and the Japanese
ans:D
8 The initial cost of a product and the product's operation and maintenance costs _____ .
A increases perceived value when balanced.
B are incidental to each other because initial costs are "sunk"
C decreases design costs as operation periods increase
D provides perceived function value and product social dysfunction
E are integrally related with each other because initial costs are "sunk".
ans:A
9 Quality control is normally performed by the _____ .
A QA personnel
B project team
C operating personnel
D project management
E None of the above.
ans:C
10 Quality and _____ are directly related.
A productivity
B cost overruns
C scope control 考试大(www.Examda。com)
D Pareto diagram
E None of the above.
ans:A
11 _____ best describes the goal of a project in its relationship with the customer, from initial contact through delivery.
A fitness for use
B customer satisfaction
C conformance to requirements
D fitness for purpose
E All of the above.
ans:B
12 The primary consideration of product management is to know the _____.
A probability of product's performance with specified parameters
B ability the product has to perform its intended function
C ability of a product to be produced within existing parameters
D functionality the product will provide over its useful life
E All of the above
ans:D
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1安全工程师《安全生产管理》知识:安全检查准备工作
- 2河北奥体中心总投资为27亿元 2015年底全面竣工
- 32015年造价工程师《计价与控制》精简教材知识点(5)
- 42015年招标师考试《法律法规与政策》专家分析(3)
- 5一级建造师管理与实务复习要点:集水总管标高高点
- 62015年咨询工程师《项目决策分析与评价》每日一练1.9
- 7宿州2015年造价工程师考试5月24日至6月9日报名
- 8评标委员会必须遵守的规则
- 9[广 西]06年造价工程师考试报名
- 102008年监理工程师《质量、投资、进度控制》习题28
- 11二建复习资料预埋件的施工方法
- 12“珍珠”雏形卧壳中 珠海大剧院2016年元旦迎首演
- 132015年咨询工程师《工程项目组织与管理》每日一练(6.20)
- 142015年重庆注册安全工程师报名入口
- 15名师达江解答二级建造师相关疑问——报名篇(十二)
- 16聚合物地坪对混凝土基面处理要求
- 17基坑支护设计与方案的选择
- 182010年PMP美国项目管理考试习题及答案六十六
- 19下列造成质量波动的原因中,属于偶然性原因的是什么
- 20武汉将挖最大人工湖 市民吐槽边填边挖瞎折腾
- 21刘永强老师讲得很透彻 准妈妈顺利通过2013二建水利增项
- 22安全工程师《安全生产技术》资料:危险化学品概念及类别划分
- 232015年招标师专业实务辅导:工程招标文件的编写
- 24混凝土输送泵主泵送系统常见故障
- 25咨询工程师《宏观经济政策与发展规划》自测题(34)
- 26浅谈绍兴某高层商住楼建筑沉降观测及分析
- 272015年造价工程师辅导:税收法律(2)
- 2808监理工程师《进度控制》练习题9
- 29工信部与住建部力推绿色建筑 助力建材行业发展
- 302015年浙江省造价工程师继续教育工作说明
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼