PMP认证考试练习题及参考答案(三十三)
A total costs
B performance over a period of time
C costs at a point of time
D variable costs
E All of the above.
ans:C
2 Parametric cost estimating involves
A using the WBS to do bottom up estimates
B defining the perimeters of the life-cycle
C calculating the individual estimates of work packages
D using a statistical model to estimate costs
E A and C
ans:D
3 Which of the statements regarding benefit-cost analysis in the Special window are true?
A 1 and 2
B 2 and 3 www.Examda.CoM
C 1 and 3
D 1, 2 and 3
E None of the above.
ans:C
4 Present value measures
A the value to us today of future cash flows.
B the rate of return on an investment when we take account of cash inflows and outflows
C the current estimates of our project budget
D the dollars worth of work accomplished as of today
E All of the above.
ans:A
5 Using the situation stated in the Special window, what is the cost performance index for Case #9?
A 1.1
B 1.91
C 0.83
D 1.2
E None of the above
ans:A
6 Sunk costs are: 来源:www.examda.com
A future costs held in reserve.
B costs invested in commodities.
C expended costs over which we have no control.
D expended costs over which we have no more control
E tax credits
ans:D
7 Managerial Reserves are:
A allowances to account for price changes that can occur over the life of a project.
B incentive fees paid to managers for good performance.
C funds used to offset poor cost or schedule estimates.
D accounts to allocate and maintain funds for contingency programs
E All of the above.
ans:D
8 Life Cycle Costing:
A is the concept of including all costs within the total life of a project.
B is an activity devoted to optimizing cost/performance
C is an activity of appraising the cost and technical performance of a completed project.
D is a process of predicting the life of a project.
E None of the above.
ans:A
9 Using the situation stated in the Special window, what is the schedule variance for Case #8?
A 1000
B 2000
C -1000
D -2000 来源:考试大
E 0
ans:C
10 Using the situation stated in the Special window, what is the cost variance for Case #9?
A ¥-1,000
B ¥1,000
C -2000
D 2000
ans:E
B
11 Using the situation stated in the Special window, what is present value of $1000 at 12% at the end of 5 years?
A ¥3,605.00
B ¥0.57
C ¥567.00
D ¥892.86
E ¥3.61
ans:C
12 Using the situation stated in the Special window, what is net present value of an annual income flow of $1600 at 14% over the next three years?
A ¥3,713.60
B ¥0.68
C ¥1,080.00
D ¥476.19
E ¥2.32
ans:A
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 12015年咨询工程师考试《宏观经济》模拟题(4)
- 2厦门花20亿打造中国首个"地下小镇" 带你体验另类桃源
- 32013年二级建造师《施工管理》每日一练(11.5)
- 4联合经营的原则内容
- 52015年云南省造价工程师考试报名时间为6月5日至7月5日
- 62015造价员复习资料:工程造价资料
- 7膨胀土地基变形量取值应符合规定
- 8景观施工组织设计
- 9[山东]市政工程检查井养护维修施工工法
- 10双洞四车道分离式隧道施工组织设计(实施)
- 112015年咨询工程师《工程咨询概论》每日一练11.19
- 122015年咨询工程师考试宏观经济政策与发展规划试题15
- 132015年咨询工程师考试《项目决策分析与评价》模拟试题(八)
- 142015安全工程师押题试卷《生产技术》(5)
- 15武汉某体育中心防水施工方案
- 162015年造价工程师《理论与法规》知识点(18)
- 17工程施工测量技术中精度分析探讨
- 182015年安全工程师考试《安全生产技术》资料:输油气站场
- 19某小区消防工程施工方案11P
- 20[四川省]06年安全工程师考试报名通知
- 21青海省2015年安全工程师考试网上报名资格审核人员联系方式
- 222015年监理工程师考试案例分析考前冲刺练(6)
- 23一级建造师管理与实务复习要点:柔性管道
- 24万庆良落马或与房地产腐败有关 搭档同学涉案
- 252015二级建造师《市政公用工程》城市道路工程(3)
- 26安全工程师答疑精华:一级发证
- 27一位考生借助网校通过监理工程师考试后的心得
- 28工程施工过程中,为加快施工进度可采取的技术措施是
- 292015年天水造价工程师报名入口
- 30冰岛阿库雷里植物园“树枝”咖啡馆 独特灵感造
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼