PMP认证考试练习题及参考答案(十六)
1. fixed-price and incentive-type contracts place responsibility for performance and financial risks associated with delay or non-performance on
the:
a. buyer
b. third party
c. contractor
d. all of the above
e. none of the above
ans: c来源:考试大
2. in a contract, the point of total assumption refers to the point where:
a. the customer incurs the total financial responsibility for each additional dollar spent.
b. the contractor incurs the total financial responsiblity for each dollar spent.
c. the schedule and cost variance are zero.
d. the customer will incur no further costs for the work the contractor performs in the completion of the contract.
e. b and d only.
ans: e
3. in a matrix organizational form, mbo may be difficult to implement:
a. if the functional employees are supervised closely by the line manager rather than the project manager
b. unless the project manager has an input into the employee's performance review
c. unless the project and line managers agree on the ultimate objective
d. unless the project and line managers agree to the duration of the task
e. none of the above are correct answers考试大(www.Examda。com)
ans: e
4. quality assurance
a. refers to the prevention of product defects
b. is an auditing function that provides feedback to the project team and client about the quality of output being produced.
c. is the technical process that include the construction of control charts which specify acceptability limits for conforming output.
d. a and b.
e. b and c
ans: b
5. which of the following communication media is least accepted by organizations?
a. tactile
b. audio
c. extrasensory
d. visual来源:考试大
e. olfactory
ans: c
6. formal written communication is mandated for which of the following?
a. scope changes not part of the original project
b. taking exception to a specification
c. procurement of raw materials
d. all of the above.
e. a and b only
ans: d
7. in performing an impact analysis, the most effective tool to ensure all risks are identified on large projects is the:
a. work breakdown structure
b. milestone review and schedule technique
c. cost/schedule control system
d. planning programming budget system
e. program and evaluation review technique
ans: a
8. in the project environment, the individual ultimately responsible for quality control is:
a. the line workers who must strive "to do things right the first time" to avoid quality problems.
b. the company's quality control manager who must work with the project members to ensure the quality control program is effective.
c. the head of the production department who retains ultimate quality control responsibility for all the company's projects.
d. the project manager who has ultimate responsibility for the entire project.
e. the customer who must ensure that he is receiving a quality product from the vendor.
ans: d
9. in which organizational form do project managers usually get to know the employees well enough to provide an input into their performance
review?
a. expediter
b. coordinator来源:考试大网
c. pure project
d. matrix
e. line-staff
ans: c
10. the critical path in a schedule network is the path that:
a. takes the longest time to complete
b. must be done before any other tasks
c. allows some flexibility in scheduling a start time.
d. is not affected by schedule slippage
e. all of the above.
ans: a
11. the use of the project reports:
a. are not necessary on small projects
b. provides a means whereby various levels of authority can judge project performance
c. provides insight into project areas and the effectiveness of the control systems
d. all of the above
e. b and cwww.Examda.CoM
ans: e
12. you must produce 27 widgets. you can only produce 9 widgets per production run. each production line setup costs $1000. each widget
consumes $10 worth of material and $5 worth of labor. what is the total fixed cost for producing the widgets.
a. 3000
b. 27000
c. 27270
d. 1335
e. 1000
ans: e
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1《工程招投标概论》复习题及参考答案(4)
- 2一级注册消防工程师考试培训资料
- 3韶关市2015年度造价工程师考试报名时间为6月8日至7月2日
- 42015项目管理与招标采购考点:服务项目采购
- 5建筑物标高有哪些控制?
- 6某框架结构会展中心消防工程施工组织设计
- 7安全工程师安全生产法复习资料——煤矿安全监察机构的职责
- 8安全工程师辅导资料:电力企业安全生产和安全管理1
- 9安全工程师考试《安全生产管理》模拟题(18)
- 102008年安全工程师考试《安全生产技术》习题九
- 11道路排水工程
- 12工程造价基础知识建设项目投资估算:投资估算的概念与作用
- 13安全工程师安全生产法复习资料——拆除工程的特殊规定
- 14安全工程师安全生产法复习资料——事故责任主体的确定
- 15国际项目沟通管理
- 16填区雨水渗透设施计算方法及关键系数
- 17安全工程师辅导资料:电器倒闸操作确保人身设备安全3
- 182015年监理工程师考试《合同管理》练习(14)
- 19如何预防搅拌车轮毂甩油轮毂轴承
- 20一级建造师管理与实务复习要点:杆距和挡距
- 21高层建筑的高程传递方法及精度分析
- 22广西开展传统村落调查工作
- 23幕墙施工过程的质量管理
- 242015年咨询工程师考试《项目决策分析与评价》模拟试题(9)
- 25全站仪在施工放样中精度的探讨
- 26二建复习资料土方工程质量标准
- 272015年招标师《案例分析》:怎样审查资格
- 2808年安全工程师《安全生产法及相关法律》习题四(无答案)
- 292015年注册安全工程师《相关法律知识》模拟试题(31)
- 30深层搅拌桩施工工法
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼