PMP认证考试练习题及参考答案(二十五)
A A grouping of related activities which last two years or more
B The first major subdivision of a project
C A grouping of projects, similar in nature, which support a product or product line and have no definable end point
D A product line 来源:www.examda.com
E Another name for a project
ans:C
2 Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:
A The project manager
B The functional manager
C The project sponsor
D The client
E All of the above
ans:A
3 The project charter is a document designed to tell _____ exactly what the project entails.
A The project manager
B The project office
C The project team
D The project sponsor
E Anyone associated with the project
ans:E
4 Work authorization forms are needed in order to:
A Authorize line organizations to charge against the project
B Establish an audit trail
C Develop a structured methodology for release of funds
D All of the above 来源:考试大网
E A and C only
ans:D
5 The scope baseline/project charter is prepared by the:
A Project manager
B Project manager and project office
C Project manager, project office and functional team
D Project manager, project office, functional team and project sponsor
E Project manager, project sponsor and customer/user
ans:E
6 Typical characteristics of a work package include:
A Representation of units of work at a level where work is performed
B Clearly distinguishes one work package from all others assigned to a single functional group
C Limits the work to be performed to relatively short periods of time
D All of the above
E A and B only
ans:E
7 Problems can occur in properly defining a project because:
A Project goals may not be agreeable to all parties
B The plan was "too loose," thus allowing priorities to change
C Low turnover of project personnel
D Too much communication between the client and project personnel
E The project objectives were quantified
ans:A
8 In preparing a good project definition, experienced project managers will:
A Concentrate mainly on the end product rather than costs or benefits. These come later.
B Realize that only the "tip of the iceberg" may be showing. As a project manager, you must get beneath it.
C Understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.
D Try to convert objectives into quantifiable terms.
E All of the above 考试大(www.Examda。com)
ans:E
9 Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.
A Preliminary planning, detail planning, closeout
B Implementation, reporting, termination
C Development, implementation, termination
D Execution, reporting, finishing
E Implementation, termination, post-audit review
ans:C
10 The contractual statement of work (CSOW)
A Must be the same as the proposal statement of work
B Does not identify reporting requirements
C Can be at a different level of detail (i.e. WBS level) than the proposal statement of work
D Identifies the contractor's organizational structure for the project
E All of the above
ans:C
11 Which of the following can result in misinterpretation of the statement of work?
A Using imprecise language (i.e. nearly, approximately)
B Mixing tasks, specifications, special instructions and approvals
C No pattern, structure or chronological order
D Wide variation in the size of tasks or details of work
E All of the above
ans:E
12 A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:
A Change the scope baseline
B Prepare a variance report
C Call a meeting of the configuration control board
D Change the project's objectives
E Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
ans:E
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1B/S结构的IT项目管理工具有什么好处?有哪些供应商?
- 2陕西省注册消防工程师报名时间
- 32015年咨询工程师《工程咨询概论》每日一练6.18
- 4山西省召开交通运输部公路隧道工程造价调研会
- 52015年安全工程师生产技术模拟题(1)
- 6一级建造师管理与实务复习要点:初灌混凝土
- 72013年二级建造师《法规》:申领施工许可证的条件
- 82015年招标师《项目管理与招标采购》辅导讲义(11)
- 92015年监理工程师备考:总复习的常用方法与技巧
- 102013年二级建造师《法规及相关知识》每日一练(5.28)
- 11武汉市公布2015年度注册安全工程师执业资格考试工作的通知
- 12灰土挤密桩施工过程中常见问题
- 13园林苗木图片对照表(灌木)
- 142015招标师考试:招标采购专业实务第十章详解5
- 15浙江宁波城乡结对架起“联心桥”
- 16塑料排水板超载预压排水固结法处理软基施工工法
- 172015年咨询工程师考试《组织与管理》模拟题(34)
- 18建设工程施工阶段进度控制的主要任务是
- 19天气热房子裂 新房天花板和地面出现17条裂缝
- 202015年咨询工程师《工程咨询概论》考试讲义8
- 21某污水处理厂主干管工程施工组织设计134P
- 22西安某区球墨铸铁管给水管道施工组织设计25P
- 23钻孔灌注桩工艺框图
- 242015年一级建造师《工程经济》第三篇冲刺讲义(4)
- 25一级建造师管理与实务复习要点:警示标志
- 26施工准备工作劳动组织准备 内容
- 272015造价工程师《理论与法规》辅导讲义(12)
- 282015年咨询工程师《项目决策分析与评价》每日一练12.10
- 292008年监理工程师《监理基本理论与相关法规》习题12
- 30招标师招标业务通用知识点:整个招标过程一般需要多长时间
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼