PMP认证考试练习题及参考答案(十五)
1. things that distort, distract, or muddle the communication process are called:
a. noise
b. selective filtering
c. selective perception
d. medium problems
e. all of the above.http://ks.examda.com
ans: a
2. which is not a consideration in a make or buy decision?
a. cost factors (least cost alternatives)
b. competitors' method of sourcing
c. existence of sufficient administration/technical personnel
d. political and social factors
e. none of the above.
ans: b
3. a work breakdown structure:
a. assures all work is identified
b. subdivides the project into manageable segments
c. provides the project sponsor with a time-phase task summary
d. both a and b
e. all of the above.来源:考试大
ans: d
4. a project manager can exchange information with the project team using which media?
a. tactile
b. audio
c. olfactory
d. visual
e. all of the above.
ans: e
5. during project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. the baseline
schedule:
a. now becomes the new schedule, including the changes, and the original baseline is disregarded.
b. is still the original baseline but annotated to reflect that a change has taken place.
c. is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
d. is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)
e. is the same since baseline schedules cannot change once the development phase is completed.
ans: c
6. sensitivity analysis can be used in risk analysis to:
a. substitute for uncertainty analysis in risk quantification
b. estimate the level of risk aversion adopted by management
c. estimate the effect of change of one project variable on the overall project
d. a and b
e. all of the above.来源:www.examda.com
ans: c
7. the pareto principle is a technique used by quality managers to determine which quality control problems of a particular service or
manufacturing process should be corrected. which of the following statements represents the philosophy of the principle?
a. in order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be
corrected.
b. the majority of defects are caused by a small percentage of the identifiable problems. improvements efforts should be reserved for these vital
few problems.
c. in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.
d. generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. the remaining 20% are not financially
worthy of improvement efforts.
e. a and d
ans: b
8. the budgeted cost of the work performed (bcwp) for a task that has just been completed can be calculated by:
a. multiplying the actual hours worked on the project by the budgeted labor rate.
b. multiplying the budgeted hours to complete the task by the budgeted labor rate.
c. dividing the actual hours required to complete the task by the budgeted labor rate.
d. cannot be determined.
e. none of the above来源:考试大
ans: b
9. the project manager has, as a prime responsibility, to assure proper integration of activities. in which organizational form does the project
manager probably have the easiest time in integrating work?
a. matrix
b. classical
c. expediter
d. coordinator
e. pure project
ans: e
10. there are four methods of government procurement. which is not one of these methods?
a. assistance
b. sealed bidding
c. competitive proposals
d. acquisition考试大(www.Examda。com)
e. small purchases
ans: d
11. a scientist is informing techs. about a new product which is starting and the type of work that the lab techs. will be expected to do. the
barriers which could hinder the lab techs. ability to filter the information include all of the following except:
a. language and semantics
b. culture and ethics
c. intelligence and knowledge base
d. reputation, authority, organizational status and position
e. relative location of the lab to the scientist's office
ans: e
12. many companies self insure against some risk. problems which can arise from self-insurance include:
a. failure to reserve funds to handle worst case scenarios (low probability events) resulting in severe financial damage to the company
b. stiff competition from insurance companies
c. confusion of business risks with insurable risks.
d. a and c
e. all of the above.
ans: d
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1铁路隧道土建工程实施性施组设计119页(新奥法 2013年)
- 2需要改进的钢结构缺点
- 3[山东]2008年度注册安全工程师执业资格考试7月15日前报名
- 4[台州市]06年安全工程师考试报名通知
- 5重庆境内某长大隧道施工组织设计
- 6高速公路隧道工程实施性施工组织设计(新奥法 115页)
- 7工程硕士之电子与通信工程领域简介
- 82015年咨询工程师《工程咨询概论》每日一练(7.3)
- 9二级建造师《法规》考点狂背:建设工程质量法律制度
- 102015年咨询工程师《项目决策分析与评价》每日一练7.29
- 112015年安全工程师《安全生产法及法律知识》巩固练习(5)
- 12某石化工程地下给排水管道施工组织设计24P
- 13市政园林景观施工组织设计
- 14现代咨询方法与实务知识点:建设规模
- 152013年二级建造师《施工管理》知识点整理:材料费
- 16预防桩体上浮措施
- 17对加强建筑企业施工现场管理的探讨
- 18井下透水时之应急措施
- 19[天津]2007年注册安全工程师考试成绩11月16日开始网上查询
- 20《项目决策分析与评价》知识点:给水系统
- 21小高层项目工程管理责任范围?
- 22水泥搅拌车行驶中振摆故障的诊断与排除
- 232012年一级建造师《经济》:短期借款的利息支付方式
- 24软件项目管理是建设工程安全管理的重要内容
- 252015年一级建造师辅导资料:焊接工艺评定
- 26浙江深化农村改革:“三权到人、权随人走、带权进城”
- 272015招标师考试:招标采购专业实务第八章详解4
- 282015年咨询工程师《方法与实务》考点:借款偿还期
- 29景观设计施工图
- 30老河口市2015年安全工程师考试报名时间确定:4月15日至24日
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼