PMP认证考试练习题及参考答案(二十)
1. on november 1, $1000 worth of work on task a was supposed to have been done (bcws); however, the bcwp was $850. calculate the
schedule variance:
a. -100
b. 100
c. -150
d. 150
e. 0.85
ans: c
2. the quality risk _____ .
a. is minimized through continuous monitoring.
b. is considered a long term risk.
c. will be reflected in the in-service life of the project result.
d. b and c
e. all of the above.
ans: e来源:www.examda.com
3. the act of conducting or supervising the exchange of information is:
a. consulting
b. project management
c. communications management
d. communications enhancement
e. none of the above
ans: c
4. the core function of the project manager is
a. systems design
b. client interfacing
c. quality assurance
d. integration来源:考试大
e.
ans: d
5. the future value of an annual income flow of $1000 for 2 years at 10% is:
a. 2200
b. 2280
c. 2300
d. 2310
e. none of the above
ans: d
6. the initial cost of a product and the product's operation and maintenance costs _____ .
a. increases perceived value when balanced.
b. are incidental to each other because initial costs are "sunk"
c. decreases design costs as operation periods increase
d. provides perceived function value and product social dysfunction
e. are integrally related with each other because initial costs are "sunk".
ans: a
7. all of the following may hinder a person's ability to transmit/receive a message except:
a. unfamiliarity with topic
b. withholding information
c. assuming
d. noise考试大(www.Examda。com)
e. preoccupation
ans: a
8. quality improvement programs are normally associated with which two of the following?
a. juran and crosby
b. juran and deming
c. crosby and deming
d. deming and the japanese
e. crosby and the japanese
ans: d
9. the utility theory _____ .
a. considers risk propensity of the decision maker.
b. attempts to formalize management's risk considerations.
c. works well with decision tree analysis.
d. is considered highly theoretical.
e. all of the above.
ans: b
10. the document authorizing functional areas to charge against the project is the:
a. work authorization form
b. scope baseline
c. project charter
d. management plan来源:考试大
e. linear responsibility chart
ans: a
11. the purpose of a dummy activity in an activity-on-arrow diagram is to:
a. identify a task that could be replaced by another.
b. take the slack time into account.
c. show a task that is not necessarily needed.
d. denote a milestone.
e. show a dependency relationship.
ans: e
12. when planning, organizing, coordinating, and controlling a project an important human resources skill or ability would be
a. building multi-disciplinary teams
b. managing conflict
c. communicating orally and in writing with all levels of personnel
d. involving senior management
e. all are important
ans: e
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1焦炉砌筑的测量放线及控制
- 2造价工程师建设工程造价管理复习资料——房地产交易的内容
- 3一级建造师项目管理复习要点:意外伤害保险
- 4水泥混凝土路面断板处理
- 5郑徐高铁徐州段打下第一桩 2016年完工
- 62015年招标师考试每日一练(8月14日)
- 72015年咨询工程师项目决策分析与评价模拟题(16)
- 8咨询工程师《工程咨询概论》模拟练习题(30)
- 9投标单位的数量有什么要求
- 10长沙市2015年度注册安全工程师考试5月11日至12日资格审核
- 11党关怀 政府帮 江西农村危房改造户喜迁新居
- 12工程造价基础知识:电弧切割
- 13招标师考试2015年未通过者如何备考
- 14[新疆]2013版工程量清单计价规范宣贯会召开通知
- 15宁波市2015年造价工程师考试报名时间确定:5月20日-6月3日
- 162015年监理工程师考试质量、投资、进度控制练习题(50)
- 172015年招标师《案例分析》模拟考试题三
- 18中国核建致力于开展并完成更多核电项目
- 19[山东]市政工程检查井养护维修施工工法
- 20某综合楼消防系统施工组织设计 29p
- 212015年注册监理工程师《合同管理》模拟题(十)
- 222015年监理工程师考试《建设工程三控》模拟练习(100)
- 23混凝土输送泵的优点以及缺点
- 2406年大连市招标代理机构从业人员考试单选题及答案(1)
- 25安全工程师安全生产法复习资料——安装、改造、维修的管理
- 262012一级建造师《公路工程》:主要材料的要求及供应计划
- 27在建设工程实施的不同阶段,目标分解应满足的要求是什么
- 28咨询工程师《政策与规划》:贯彻科学发展观的指导思想
- 29岩溶隧道管棚支护工法
- 302008年监理工程师《质量、投资、进度控制》习题29
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼