PMP认证考试练习题及参考答案(十)
1. a contractor estimates that a project has a 0.5 probability of $200,000 profit and 0.3 probability of $50,000 loss. the expected monetary value
of this project is:
a. 200000
b. 150000
c. 85000来源:考试大
d. 50000
e. none of the above.
ans: c
2. a project manager who allows the team to make the majority of the decisions is demonstrating a(n) ____ leadership style.
a. laissez-faire
b. boss-centered
c. subordinate centered
d. autocratic
e. demographic
ans: c
3. historical records during close-out are useful to _____ and _____ for future projects.
a. predict trends, highlight problems.
b. analyze successes, shortfalls.
c. analyze strengths, document results.来源:www.examda.com
d. support litigation, defend claims.
e. justify results, set standards.
ans: a
4. in a fishbone diagram, the effect you are concerned about is placed:
a. at the right-hand end of the spine.
b. at the end of the diagonal line (i.e. "fin").
c. on a branch of a fin.
d. at the left-hand end of the spine.
e. none of the above.
ans: a
5. sound, prudent, but often unsophisticated judgement is called:
a. common sense
b. rational management
c. smoothing
d. confrontation
e. none of the above
ans: a
6. which of the following types of specifications gives measurable capabilities of the product:
a. functional specifications
b. performance specifications
c. conformance specificationshttp://ks.examda.com
d. technical specifications
e. process capability specification
ans: b
7. a graphical display of accumulated costs and labor hours for both budgeted and actual costs, plotted against time, is called a(n) _____.
a. trend line.
b. trend analysis.
c. s curve.
d. percent completion report.
e. earned value report.
ans: c
8. by using project risk management techniques, project managers can develop strategies that do all but which of the following:
a. significantly reduce project risks
b. eliminate project risks
c. provide a rational basis for better decision making
d. identify risks, their impact(s), and any appropriate responses
e. none of the above.
ans: b
9. in a flowchart, the diamond form is used to represent:
a. a starting point.
b. an operation.
c. a written report.
d. a decision point.
e. an end point.
ans: d
10. in small companies, project managers and line managers are:
a. never the same person
b. always the same person
c. sometimes the same person
d. always in disagreement with each other
e. forced to act as their own sponsors
ans: c
11. make or buy decisions are usually made during the _____ phase of a project.
a. conceptual
b. development.
c. implementationwww.Examda.CoM
d. execution
e. close-out
ans: b
12. managers who adopt a sound, but prudent managerial style are called
a. authorization
b. conciliatory
c. ethical
d. judicial
e. promotional
ans: d
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1政府采购招标的程序与技巧
- 2宏观经济政策与发展规划考点:我国政府采购制度的概念以及基本内容
- 32015年招标师《项目管理与招标采购》课件(11)
- 42015年招标师《招标采购法律法规与政策》试题(9)
- 5造价工程师复习资料:概算定额与预算定额的相同点和差异
- 62004年度监理工程师执业资格考试应试分析
- 7高速公路防撞护栏施工
- 82015年二级建造师《建筑》:内脚手架
- 92015招标师《招标采购项目管理》知识点整理2
- 10钻孔过程出现的掉钻落物问题
- 11安全工程师安全生产法复习资料——申请行政复议或者提起行政诉讼
- 12安全工程师答疑精华:产生静电的最大危险
- 132012年pmp模拟试题及答案(九)
- 14[广西]07安全工程师考试4.27起报名
- 15达陕高速公路某隧道施工组织设计(分离式隧道)
- 16[云南省]2005造价工程师5月9至5月27报名
- 17洞头县连港环岛公路长坑隧道工程某标段(投标)施工组织设计
- 18安全工程师考试《安全生产管理》第二讲讲义精选(3)
- 19启动2009年度招标师再登记工作通知
- 202015年咨询工程师考试《工程咨询概论》考前练习题(3)
- 21基坑支护形式之土钉墙支护
- 222015年招标师考试《项目管理与招标采购》课件(14)
- 23安全工程师相关法律知识复习要点:安全生产法律体系
- 24碳纤维结构补强施工工法与检验方法
- 25广西开展全区农村危房改造资金专项整治行动
- 26【招标采购专业实务】第一章考点:采购目标的实现
- 27[陕西]整体式连拱隧道施工组织设计
- 28混凝土搅拌输送车操作安全技术
- 29安全工程师考试《安全生产管理》第五讲讲义精选(3)
- 30黄强:地基工程方向BIM技术前景广阔
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼