PMP认证考试练习题及参考答案(七)
1. which of the following is associated with a buyer's request for material to meet a particular need:
a. material warranty
b. material guarantees
c. implied warranty of salability
d. implied warranty of fitness for a particular purpose
e. a and c onlywww.Examda.CoM
ans: d
2. a project manager trying to communicate accurately to the team should use:
a. the language of the team members
b. the language of the project manager
c. non-verbal methods
d. written memos
e. all of the above.
ans: a
3. an advertiser who uses a movie or sports star to endorse a product is trying to use power.
a. expert
b. legitimate
c. reward
d. influential
e. referent
ans: e来源:考试大
4. control chart theory is based on the differentiation of the causes of variations in quality. variations may be produced by assignable causes.
all of the following are examples of assignable causes except:
a. differences among machines.
b. differences among workers.
c. differences among materials.
d. differences in each of these factors over time.
e. none of the above (all are examples)
ans: e
5. giving a part of project work to a contractor is an example of:
a. risk mitigation
b. risk assignment
c. risk delegation
d. risk deflection
e. risk assumption来源:www.examda.com
ans: d
6. proper implementation of project management will guarantee that:
a. budgets will be met.
b. schedules will be adhered to.
c. quality/performance will be met.
d. the project will be a success.
e. none of the above.
ans: e
7. the most effective means of determining the cost of a project is to price out the _____.
a. work breakdown structure.
b. linear responsibility chart.
c. project charter.
d. scope statement.
e. management plan.
ans: a
8. which method shown below is acceptable for reducing cost or shortening the schedule?
a. "crashing"
b. changing scope.
c. performing activities in parallel rather than in series.
d. all of the above.
e. a and c only.考试大(www.Examda。com)
ans: d
9. which of the following terms is used to describe the receipt issued by a carrier for items to be delivered to a third party:
a. free on board
b. receipt for merchandise
c. packaging list
d. loading list
e. bill of lading
ans: e
10. a computer tape which contains historical project information is called ____ tape.
a. database
b. baseline.
c. archive.
d. lessons learned.
e. life cycle summary.
ans: c
11. according to herzberg, which of the following is a motivational factor?
a. pay
b. hygiene needs
c. achievementwww.Examda.CoM
d. working conditions
e. vacation time
ans: c
12. communication in both project and non-project-driven organizations should occur in directions.
a. one
b. two
c. three
d. four
e. five
ans: e
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1特种燃磷炉采取的安全措施
- 2咨询工程师考试《宏观经济政策与发展规划》自测题(29)
- 32015造价员《土建工程》知识:工程上常用的投影图
- 4二级建造师法规知识点:联合体投标应当签订协议
- 5一级建造师建设工程法规及相关知识:买货方违约
- 62015年安全工程师相关法律知识练习(10)
- 72015造价员考试基础知识:方案比选方法与造价控制
- 82015年二级建造师《建筑》:模板工程安全检查评分表
- 9现代咨询方法与实务考点:效果计量单位的选择
- 10上海某体育中心工程地下室外墙防水施工方案(QBZ-F涂料)
- 11招标师职业水平考试:项目管理与招标采购第二章练习题39
- 122015年咨询工程师《宏观经济政策与发展规划》每日一练4.2
- 132015年咨询工程师《工程项目组织与管理》每日一练7.30
- 14盖瓦(粘土瓦)屋面施工安全要求
- 152006年备考监理工程师技巧准则
- 162015年一级建造师《公路工程》路面工程施工(10)
- 172007年安全工程师考试报名信息汇总(密切关注……)
- 182015年咨询工程师《工程项目组织与管理》每日一练2.27
- 193M升层混凝土施工技术在三峡工程中的应用
- 202015造价员复习资料:甲级工程造价咨询企业资质标准
- 21河北省关于补办2015年注册造价工程师继续教育的通知
- 22西南最大转体桥梁完成84度华丽转身 跨越遂成铁路
- 23招标公证的方式和程序
- 242015年安全工程师安全生产技术练习题(4)
- 25某四层综合楼消防系统工程施工组织设计
- 26黑龙江2015年安全工程师考试补报名时间为6月24日至26日
- 272015年青海造价工程师报名时间为7月2日-7月11日
- 28零基础上班族2015年如何在短暂时间内备考招标师考试
- 29一级建造师《建设工程经济》重点解析(16)
- 30为什么要进行钢筋下料长度的计算
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼