2010年PMP美国项目管理考试习题及答案六十五
QUEST Quality assurance
A refers to the prevention of product defects
B is an auditing function that provides feedback to the project team and client about the quality of output being produced.
C is the technical process that include the construction of control charts which specify acceptability limits for conforming output.
D A and B.
E B and C
参考答案:B
QUEST The Japanese Quality Control (QC) Circle movement motivated its participants in many ways. Which of the following represents the most important motivation for the QC circle participants?
A improving the performance of the company
B self-improvement
C financial incentives
D recognition among co-workers
E strengthening of relationships between co-workers
参考答案:A
QUEST The Pareto Principle is a technique used by quality managers to determine which quality control problems of a particular service or manufacturing process should be corrected. Which of the following statements represents the philosophy of the principle?
A In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected.
B the majority of defects are caused by a small percentage of the identifiable problems. Improvements efforts should be reserved for these vital few problems.
C in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.
D generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.
E A and D
参考答案:B
QUEST A process characteristic has a true mean of 150 and a true standard deviation of 20. A sample of 25 items is taken from this process. The standard error of the estimate is:
A 0.2
B 0.8
C 4
D 5
E 7.5
参考答案:C
QUEST Quality attributes
A are used to determine how effectively the organization accomplishes its goals
B can be objective or subjective in nature
C are specific quality characteristics for which a product is designed, built, and tested.
D A and B.
E B and C
参考答案:E
相关试题:
2010年PMP美国项目管理考试习题及答案六十四
试题推荐:
2010年PMP美国项目管理认定考试全真模拟试题精选1
2010年PMP美国项目管理认定考试全真模拟试题精选2
2010年PMP美国项目管理认定考试全真模拟试题精选3
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 12015年招标师考试每日一练(7月21日)
- 22015招标师考试教材《法规与政策》:第四章5
- 3小型混凝土预制构件施工工法
- 42015年招标师考试重点归纳:采购程序
- 5咨询工程师2015年考试《组织与管理》习题(9)
- 6【招标师考试】项目管理与招标采购第二章:风险分类(一)
- 7钻孔灌注桩的质量保证措施
- 82013年湖南二级建造师注销注册申请表
- 9搅拌车暖风和防冻使用技巧
- 102015年咨询工程师《工程项目组织与管理》每日一练(11.6)
- 11万科如何放权一线:毛大庆“被离职”传言背后
- 122015年招标师《招标采购案例分析》练习及答案(7)
- 13美国6.1级地震“零死亡” 建筑抗震立头功
- 14优质的混凝土泵合格的性能
- 15沉井下沉方法
- 16中铁二十三局三公司沪昆客专项目主体工程全部完工
- 17安全工程师考试《法律法规》知识要点复习(7)
- 182015年咨询工程师《项目决策分析与评价》每日一练8.13
- 19给水排水系统图( 施工图) 绘制规则
- 202015年安全工程师《安全生产法及法律知识》巩固练习汇总
- 212015年造价工程师考试《理论与法规》知识精选(13)
- 22咨询工程师《工程咨询概论》模拟练习题(30)
- 232013年二级建造师《建筑》:模板工程设计的主要原则
- 242015招标师专业实务考点:工程设计类招标文件包含的基本内容
- 252015年招标师考试招标采购法律法规与政策辅导讲义一
- 26某桥斜拉索挂索施工
- 27一级建造师管理与实务复习要点:临时设施的问题
- 282015年咨询工程师《工程咨询概论》模拟题(36)
- 292015年通辽造价工程师现场审核地点及时间
- 30造价工程师土建计量复习要点:材料层次
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼