2010年PMP美国项目管理考试习题及答案六十四
QUEST The best way to insure quality conformance is to _____.
A distribute the responsibility to subordinates.
B maintain total control.
C train each worker to implement the work.
D inspect quality into the project.
E None of the above.
参考答案:C
QUEST In order to achieve long-term quality improvements, management must do the following:
A Motivate the employees with seminars, contests, and institute programs such as "Quality Improvement' day.
B Create a quality control department and give the head of the department ultimate responsibility for quality improvement.
C Implement of a formal quality control program with worker and management involvement.
D Establish financial incentive packages for worker.
E A and D
参考答案:C
QUEST The zero defects concept
A is a performance standard for management
B is a motivational technique that promotes "doing it right the first time".
C is used by management to communicate to all employees that everyone should do things right the first time.
D A and C.
E B and C
参考答案:D
QUEST An acceptance control chart has limits that are based on the spec. limits for the product rather than limits which differentiate between random and assignable causes. Under which of the following circumstances should a QC manager consider this type chart
A When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process
B When the number of samples outside the current control chart limits become too costly and cumbersome to investigate.
C When a process is subject to constant but stable tool wear.
D A and B.
E A and C
参考答案:E
QUEST In the project environment, the individual ultimately responsible for quality control is:
A The line workers who must strive "to do things right the first time" to avoid quality problems.
B the company's quality control manager who must work with the project members to ensure the quality control program is effective.
C The head of the production department who retains ultimate quality control responsibility for all the company's projects.
D The project manager who has ultimate responsibility for the entire project.
E the customer who must ensure that he is receiving a quality product from the vendor.
参考答案:D
相关试题:
2010年PMP美国项目管理考试习题及答案六十三
试题推荐:
2010年PMP美国项目管理认定考试全真模拟试题精选1
2010年PMP美国项目管理认定考试全真模拟试题精选2
2010年PMP美国项目管理认定考试全真模拟试题精选3
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 12012年一级建造师《经济》:短期借款的利息支付方式
- 2某桥面面层改性沥青混凝土施工
- 3西安市某住宅小区地下室防水施工方案
- 42015年咨询工程师知识点:工程咨询单位的风险
- 5绿化工程施工质量控制措施
- 6项目决策的重要性
- 7江苏省安全工程师资格考试信息管理通知
- 8搅拌车贴膜封釉封塑的注意事项
- 9安全工程师电工安全技术考核试卷(F卷)
- 10咨询工程师考试《宏观经济政策与发展规划》自测题(3)
- 112015年咨询工程师《工程项目组织与管理》每日一练10.28
- 12一级建造师管理与实务复习要点:管道试压
- 132013年二级建造师《施工管理》每日一练(2.16)
- 14煤矿井下预防冒顶的措施
- 15【感谢名师】考试通过发感言 丰景春老师评价高
- 162015造价员《安装工程》知识:审核工程必须做到的几点
- 17预应力混凝土连续梁、连续刚构悬臂灌注施工
- 182015项目管理与招标采购考点:投融资服务项目进度管理
- 192015年安全工程师考试《安全生产管理知识》练习题(24)
- 20别让这些招标概念混淆了你
- 212012一级建造师《公路工程》:公路工程施工组织的特点
- 222015年招标师考试答疑精选:投标保证金的收取比例是多少
- 232015年一级建造师考试辅导:项目管理规范(二十九)
- 24造价工程师复习资料:在住宅小区规划设计中节约用地的主要措施
- 252015年招标师《法律法规》:发包与承包
- 26基坑降水有哪些作用?
- 272015年咨询工程师《工程咨询概论》每日一练(11.14)
- 28钢筋混凝土斜塔斜拉桥的设计特点及施工技术
- 29创造国内钢箱梁顶推跨越高铁施工新纪录
- 302013年二级建造师《法规及相关知识》每日一练(11.16)
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼