2010年PMP美国项目管理考试习题及答案五十五

申请免费试用、咨询电话:400-8352-114

QUEST A _____ estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%). 
A Parametric 
B Definitive. 
C Budget 
D Bottom up. 
E Top down. 
参考答案:C

QUEST The most precise or accurate estimate for determining project costs is the _____ estimate. 
A Definitive. 
B Analogy 
C Budget 
D Modified standards. 
E Rule of thumb. 
参考答案:A

QUEST Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach. 
A Definitive, bottom up. 
B Analogy, top down. 
C Parametric, bottom up. 
D Parametric, top down. 
E Analogy, bottom up. 
参考答案:D

QUEST A(n) _____ system is designed to ensure the timely availability of nonhuman resources, and includes the cost in procurement, shipping/freight, storage and loss. 
A Inventory control. 
B Materials management. 
C Procurement. 
D All of the above. 
E A and C only. 
参考答案:B

QUEST There are two major types of reserves used on  projects.  The _____ is for (usually major) scope changes that were not considered as part of the original plan, whereas the _____ is to compensate for minor changes  in estimating, escalation factors. 
A Management reserve, unplanned allowance fund. 
B Management reserve, contingency. 
C Contingency fund, management reserve. 
D Unplanned allowance fund, budgetary reserve. 
E Unplanned reserve, planned reserve. 
参考答案:C

相关试题:

2010年PMP美国项目管理考试习题及答案五十四

试题推荐:

2010年PMP美国项目管理认定考试全真模拟试题精选1

2010年PMP美国项目管理认定考试全真模拟试题精选2

2010年PMP美国项目管理认定考试全真模拟试题精选3

发布:2007-03-02 10:54    编辑:泛普软件 · xiaona    [打印此页]    [关闭]
相关文章:

泛普软件项目管理工具其他应用

项目管理工具 禅道项目管理软件 梦龙项目管理软件 微软项目管理软件 装饰管理系统 装修预算软件 项目计划软件 项目进度管理软件 软件项目管理工具 材料管理软件 工程项目管理软件系统 项目管理系统 施工管理软件 建筑工程项目管理软件 工程管理软件