2010年PMP美国项目管理考试习题及答案三十
QUEST The first step in building a PERT/CPM network is to:
A Create a flow chart
B Determine the critical path
C Show task relationships
D Create a work breakdown structure
E None of the above.
参考答案:D
QUEST The critical path in a schedule network is the path that:
A Takes the longest time to complete
B Must be done before any other tasks
C Allows some flexibility in scheduling a start time.
D Is not affected by schedule slippage
E All of the above.
参考答案:A
QUEST Assume that you have a network where an activity on the critical path can be crashed by two weeks. If the activity is actually crashed by two weeks, then:
A The project's schedule will be reduced by 2 weeks.
B The available slack on the noncritical paths will increase.
C A new critical path may appear after the crash.
D All of the above.
E A and B only.
参考答案:C
QUEST Your team has prepared a CPM schedule for your review. You notice that one node has six inputs (including two dummy activities) and four outputs (which include one dummy activity). Select the correct statement from the following:
A This is a valid representation if the logic is correct.
B This is invalid because a node can have a maximum of one dummy input representation if the logic is correct.
C This is invalid because nodes cannot have both dummy inputs and dummy outputs.
D This is a invalid because the number of outputs must equal the number of inputs.
E This is invalid because a maximum of two inputs and two outputs are allowed using the critical path method.
参考答案:A
QUEST During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:
A Now becomes the new schedule, including the changes, and the original baseline is disregarded.
B Is still the original baseline but annotated to reflect that a change has taken place.
C Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
D Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)
E Is the same since baseline schedules cannot change once the development phase is completed.
参考答案:C
相关试题:
2010年PMP美国项目管理考试习题及答案二十九
试题推荐:
2010年PMP美国项目管理认定考试全真模拟试题精选1
2010年PMP美国项目管理认定考试全真模拟试题精选2
2010年PMP美国项目管理认定考试全真模拟试题精选3
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1酉沿高速重庆段首座长隧道贯通 全线有望2016年通车
- 2《现金咨询方法与实务》知识点:设备及厂房系数法
- 3造价工程师复习资料:企业对项目经理部可控责任成本的考核内容
- 42015安全工程师《生产管理知识》典型题(10)
- 5小心搅拌车发动机故障
- 62015年安全工程师考试《事故案例分析》模拟题(13)
- 7改性沥青瓦施工工艺
- 813年福建造价员资格考试时间已作调整
- 9可不进行轻型动力触探有哪些情况?
- 10PMP认证考试练习题(八)(中英文)
- 11重庆某隧道施工组织设计
- 122015年监理工程师考试理论与法规练习题(54)
- 132015年监理工程师《建设工程三大控制》练习题(125)
- 14CPMP、PMP及IPMP三种项目管理可比性的级别比较
- 152015年咨询工程师《项目决策分析与评价》每日一练(6.17)
- 16广东农村垃圾收运:户收集、村集中、镇转运、县处理
- 17关于安全生产法的“调整”
- 18±660kV换流站工程一级网络计划图
- 192015年招标师考试考点:招标投标法律法规的主要规定
- 20沥青混凝土路面机械摊铺施工工法
- 21【达江解惑一】与名师对话 让我们一起从平凡走向成功
- 222015年安全工程师考试《安全生产技术》:拆除工程
- 23北京管庄新楼外围雨后下沉 施工人员称不会影响
- 24湖南省益阳市2015年注册安全工程师报名说明
- 252015年招标采购专业实务模考练习题七
- 262015年二级建造师《施工》:安装工程费用的结算方法
- 27[中天]建筑工程实测实量操作手册(结构、砌筑、抹灰)
- 282015年招标师法律法规政策考试练习题(23)
- 29象山市2015年安全工程师考试报名时间为4月14日至28日
- 30一级建造师实务复习要点:隐蔽工程
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼