QUEST Which of the following can result in misinterpretation of the statement of work? 
A Using imprecise language (i.e. nearly, approximately) 
B Mixing tasks, specifications, special instructions and approvals 
C No pattern, structure or chronological order 
D Wide variation in the size of tasks or details of work 
E All of the above 
参考答案:E

QUEST A project manager believes that modifying the scope of the project may provide added value for the customer.  The project manager should: 
A Change the scope baseline 
B Prepare a variance report 
C Call a meeting of the configuration control board 
D Change the project's objectives 
E Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline 
参考答案:E

QUEST The document authorizing functional areas to charge against the project is the: 
A Work authorization form 
B Scope baseline 
C Project charter 
D Management plan 
E Linear responsibility chart 
参考答案:A

QUEST Going from Level 2 to Level 4 in the work breakdown structure will result in 
A Less estimating accuracy 
B Better control of the project 
C Lower status reporting costs 
D A greater likelihood that something will fall through the cracks 
E None of the above 
参考答案:E

QUEST Graphical displays of accumulated cost and labor hours, plotted as a function of time, are called: 
A Variance reports 
B S curves 
C Trend analysis 
D Earned value reporting 
E Baseline control 
参考答案:B

相关试题:

2010年PMP美国项目管理考试习题及答案十

试题推荐:

2010年PMP美国项目管理认定考试全真模拟试题精选1

2010年PMP美国项目管理认定考试全真模拟试题精选2

2010年PMP美国项目管理认定考试全真模拟试题精选3

发布:2007-03-02 10:55    编辑:泛普软件 · xiaona    [打印此页]    [关闭]
相关文章:

泛普软件项目管理工具其他应用

项目管理工具 禅道项目管理软件 梦龙项目管理软件 微软项目管理软件 装饰管理系统 装修预算软件 项目计划软件 项目进度管理软件 软件项目管理工具 材料管理软件 工程项目管理软件系统 项目管理系统 施工管理软件 建筑工程项目管理软件 工程管理软件