A change control system should include all the following except-
a.Procedures for automatic approval of defined categories of change
b. Paperwork, tracking systems, and approval levels necessary for authorizing changes
c. A description of the powers and responsibilities of the change control board
d. Procedures for conducting a midproject control system review
Qustions 3:
Two fundamental objectives of project control are to--
a. Alter activities to achieve results and manage organizational assets
b. Eliminate unexpected technical problems and identify technical difficulties that require more resources
c. Ensure that resources are available when needed and avoid increases in the scope of work
d. Have the required material, personnel, and equipment available when needed and ensure that budgeting is adequate
Qustions 5:
The project plan is important in change control because it--
a.Provides the baseline against which changes are managed
b. Provides the information on project performance
c. Alerts the project team to issues that may cause problems in the future
d. Is expected to change throughout the project
Qustions 2:
Written changes orders should be required on --
a. All projects, large and small
b. Large projects
c. Projects with a formal configuration management system in place
d. Projects for which the cost of a change control system can be justified
Qustions 4:
The principal sources of project failure are-
a. Lack of a projectized or strong matrix structure, poor scope definition, and lack of a project plan
b. Lack of commitment or support by top management, disharmony on the project team, and lack of leadership by the project manager
c. Poorly identified customer needs, a geographically dispersed project team, and little communication with the customer until the project is delivered
d. Organizational factors, poorly identified customer needs, inadequately specified project requirements, and poor planning and control
Qustions 6:
Interface management is --
a.Considered to be one of the easier aspects of implementing the project plan
b.Primarily concerned with the technical issues associated with linking system components in a configuration
c.Facilitated by use of the WBS to display the ways people on the project interact and their duties and responsibilities
d.The process of coordinating the various elements of the project so that they meet their joint goals of performance, schedule, and budget
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1某道路改造及管线铺设工程施工组织设计
- 2地震专家:水库蓄水与大地震无必然联系
- 32015年监理工程师《建设工程合同管理》练习题(95)
- 42015年注册安全工程师考试《管理知识》:预警评价指标
- 5黄土地基上的路堤填筑要求
- 62015年造价员基础知识:工程造价信息的管理
- 7预算拮据之装修房子的10个重要点
- 82015年二级建造师《施工管理》每日一练汇总
- 92012一级建造师《公路工程》正版考试用书增值服务第三次
- 102015年安全工程师相关法规模拟练习(12)
- 11江苏坚持在村庄环境整治中反对形式主义 落实长效机制
- 12造价工程师建设工程造价管理复习资料——设备租赁与购置分析
- 132015年二级建造师《市政》:预算、计划、统计、合同人员的管理责任内容
- 142015年深圳造价工程师考试用书预订注意事项公告
- 15机场建设费饱受争议变身民航发展基金 一年29亿支出无明细
- 16安全工程师考试《法律法规》习题班讲义精选(30)
- 172015年监理工程师《建设工程三大控制》练习题(54)
- 182015造价员《土建工程》知识点:浮笼
- 192015年招标师《项目管理与招标采购》讲义(3)
- 20建设项目董事会的职权包括哪些
- 212015年咨询工程师《组织与管理》模拟题(3)
- 22建筑深基坑工程主要特点有哪些
- 232015年注册咨询工程师《工程咨询概论》模拟题(37)
- 24浅谈土工膜在混凝土坝缺陷修补中的应用
- 25公园道路园林绿化施工组织设计
- 262015招标师职业水平考试考点:行政法律责任
- 27监理工程师考试2015年《建设工程合同管理》练习题(7)
- 28搅拌车发动机保养小知识
- 292015年咨询工程师《工程咨询概论》每日一练7.9
- 302015年咨询工程师每日一练免费在线测试(2015.11.14)
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼