A change control system should include all the following except-
a.Procedures for automatic approval of defined categories of change
b. Paperwork, tracking systems, and approval levels necessary for authorizing changes
c. A description of the powers and responsibilities of the change control board
d. Procedures for conducting a midproject control system review
Qustions 3:
Two fundamental objectives of project control are to--
a. Alter activities to achieve results and manage organizational assets
b. Eliminate unexpected technical problems and identify technical difficulties that require more resources
c. Ensure that resources are available when needed and avoid increases in the scope of work
d. Have the required material, personnel, and equipment available when needed and ensure that budgeting is adequate
Qustions 5:
The project plan is important in change control because it--
a.Provides the baseline against which changes are managed
b. Provides the information on project performance
c. Alerts the project team to issues that may cause problems in the future
d. Is expected to change throughout the project
Qustions 2:
Written changes orders should be required on --
a. All projects, large and small
b. Large projects
c. Projects with a formal configuration management system in place
d. Projects for which the cost of a change control system can be justified
Qustions 4:
The principal sources of project failure are-
a. Lack of a projectized or strong matrix structure, poor scope definition, and lack of a project plan
b. Lack of commitment or support by top management, disharmony on the project team, and lack of leadership by the project manager
c. Poorly identified customer needs, a geographically dispersed project team, and little communication with the customer until the project is delivered
d. Organizational factors, poorly identified customer needs, inadequately specified project requirements, and poor planning and control
Qustions 6:
Interface management is --
a.Considered to be one of the easier aspects of implementing the project plan
b.Primarily concerned with the technical issues associated with linking system components in a configuration
c.Facilitated by use of the WBS to display the ways people on the project interact and their duties and responsibilities
d.The process of coordinating the various elements of the project so that they meet their joint goals of performance, schedule, and budget
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1保定市人事考务中心公布2015注册安全工程师考务通知
- 2经济政策与发展规划考点:投资结构概念
- 3设备租赁与购置分析的步骤
- 42012一级建造师《工程经济》:建造合同收入的确认(2)
- 52015年一级建造师《建设工程项目管理》知识摘要(12)
- 6地下水潜蚀为什么会形成土洞
- 72015年咨询工程师《项目决策分析与评价》每日一练4.16
- 8河南省2008年度造价工程师执业资格考试5月15日-30日报名
- 9建筑工程标准施工工艺工法参考节点(220页、2011年)
- 10监理工程师考题精选——进度控制(三)
- 112015造价工程师考试《理论与法规》课程讲义(11)
- 12青海玉树首座高海拔特长隧道红土山隧道贯通
- 132013年中国施工装备展览洽商会举行
- 142013年二级建造师《施工管理》每日一练(1.10)
- 152013年二级建造师《机电》重点:自行式起重机
- 16招标师法律法规与政策考前练习题6
- 172013年二级建造师课程免费试听
- 1828 兆瓦天然气分布式能源项目落户隆昌工业园
- 19景观一期扩初图
- 202015招标师职业水平考试考点:招标人的法律责任
- 21巴州2015年造价工程师考试报名时间为5月3日-31日
- 22[深圳]建设工程技术经济指标案例征集通知
- 23由室外转入室内中孚泰“剧院社区化”根治广场
- 242015年咨询工程师《工程咨询概论》每日一练7.3
- 252015年咨询工程师《项目决策分析与评价》每日一练12.9
- 262015年招标师《招标采购案例分析》串讲资料下载(11)
- 272015一级建造师《工程经济》冲刺复习(19)
- 28选购原木门技巧
- 29一级建造师管理与实务复习要点:问题
- 30森林公园整治提升II标段工程施工组织设计136p
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼