Which statement about customer expectations is not true --
a. The product or service should be usable as intended.
b. Contractual provisions, including schedule and performance standards, should be met.
c. Changes should be made immediately, and all customer wants should be satisfied without bureaucratic hassle
d. The seller should assume the responsibility of understanding customer needs and addressing them effectively.
Qustions 3:
The document that describes the objectives, work content, deliverables, and end product of a project is the--
a. Project charter
b. Product description
c. Scope statement
d. WBS&nb
sp;
Qustions 5:
Maintenance is crucially important to projects and should--
a. Be included as an activity to be performed during the closeout phase
b. Have a separate phase in the life cycle in information systems projects because 60% to 70% of life-cycle costs of computer systems are generally devoted to maintenance
c. Not be viewed as part of the project life cycle
d. Always be viewed as a separate project
Qustions 2:
The WBS is an input to scope change control because it--
a. Provides information on project objectives
b. Defines the project’s scope baseline
c. Defines all project baselines
d. Provides informat
ion on scope performance
Qustions 4:
When an organization chooses a project selection model, the most important criterion is --
a. Capability
b. Realism
c. Ease of use
d. Cost
Qustions 6:
A project manager’s company operates in a high-technology area requiring the integration and sharing of several functional specialties. The project manager is considering the appropriate organizational structure ofr a new project, the likely choice would be --
a. Matrix
b. Tight matrix
c. Functional
d. Projectized
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 1水处理用石英砂滤料密度检验方法?
- 208监理工程师《质量控制》练习题3
- 32015年招标师采购案例分析全真模拟题2
- 4合福高铁旌德段首孔箱梁架设成功
- 5一级建造师管理与实务复习要点:防水工程隐蔽工程验收
- 62015一级建造师《建设工程经济》讲义汇总(20)
- 7安全生产事故案例分析:案例31及练习
- 82015安全工程师《相关法律知识》考点精华:煤矿安全监察
- 9我国首座加设“封闭式防尘罩槽形梁”获多项殊荣
- 102015年造价工程师(土建)知识点精选(26)
- 11道路园林景观施工组织设计108p
- 12造价人员的经验心得(二)
- 132008年安全工程师考试《安全生产法及相关法律知识》习题二十一
- 142015造价工程师考试《理论与法规》课程讲义(3)
- 15招标师问答:招标公告必须有哪些内容
- 162015年招标师《招标采购案例分析》串讲资料下载(11)
- 172015年咨询工程师《分析与评价》模拟题(14)
- 18安徽固镇县严控保障房建设工程挂靠、转包等违规行为
- 192015年一级建造师辅导资料《机电》:考点问答(十五)
- 20过程检验和试验程序详细 主要内容
- 21重庆市某浸塑钢丝网围栏工程施工组织设计
- 222015年招标师专业实务辅导:资格审查的注意事项
- 232015年二级建造师《法规及相关知识》解题技巧(三)
- 24二级建造师考试复习总结:框支承玻璃幕墙制作安装
- 252012一级建造师《市政工程》:对软土等工程处理的一般方法
- 26项目组织与管理考点:项目沟通重要性
- 272015招标师考试:招标采购专业实务第八章详解2
- 28新建铁路成都至绵阳至乐山客运专线某标段某隧道(实施)施工组织设计
- 292015年安全工程师《安全生产法》:安全生产标准体系
- 30支撑体系布詈设计应考虑的要求
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼