PMP美国项目管理认证的模拟考试的样题9
A. Analysis of alternatives.
B. Revisions/replanning.
C. Resource allocation.
D. Modification or updating of goals and objectives.
E. All of the above.
ANS: E
2. The basic terminology for networks includes:
A. Activities, events, manpower, skill levels and slack.
B. Activities, documentation, events, manpower and skill
levels.
C. Slack, activities, events, and time estimates.
D. Time estimates, slack, sponsorship involvement, and
activities.
E. Time estimates, slack time, report writing, life
cycle phases, and crashing times.
ANS: C
3. The project manager must receive reports and
briefings from engineers, contracting officers,
procurement personnel and marketing people.
The project manager’s communication dilemma is one of:
A. encoding
B. decoding
C. choice of a medium
D. one-way communication
E. All of the above.
ANS: E
4. The technique most commonly used to determine the
profitability of a project includes _____ methods.
A. Net present value (NPV).
B. Return on investment (ROI).
C. Discounted cash flow (DCF)
D. Payout time and risk sensitivity analysis.
E. All of the above.
ANS: E
5. Which of the following are part of the purchasing
cycle:
A. define need
B. prepare and issue purchase order
C. inspect incoming goods
D. All of the above.
E. A and B only
ANS: E
6. Which of the following is closest to Juran’s
definition of Quality:
A. conformance to requirements.
B. fitness for use.
C. continuous improvement.
D. customer focus.
E. All of the above.
ANS: B
7. A project element which lies between two events is
called:
A. An activity.
B. A critical path method.
C. A slack milestone.
D. A timing slot.
E. A calendar completion point.
ANS: A
8. Employee unions would most likely satisfy which
level in Maslow’s hierarchy of needs?
A. Belonging
B. Self-actualization
C. Esteem
D. Safety
E. Empowerment
ANS: A
9. Management calls a meeting to explain to all
employees the new benefits package for the rank and
file. This is an example of:
A. Upward communication
B. Downward communication
C. One-way communication
D. Two-way communication
E. None of the above.
ANS: C
10. Project management/project planning is most closely
aligned with:
A. Long range/strategic planning (5 years or more).
B. Intermediate range planning (1 to 5 years)
C. Short range/tactical planning (1 year or less).
D. All of the above.
E. B and C.
ANS: E
- 1建筑工程项目管理软件
- 2软件项目管理工具
- 3项目管理系统
- 4工程行业科研项目管理系统
- 5工程项目管理软件下载
- 6开源项目管理系统下载
- 7工程项目管理
- 8多项目管理
- 9项目管理
- 10哪家项目管理好
- 11企业项目管理排名
- 12项目管理系统有哪些
- 12015招标师《项目管理与招标采购》:履行合同的担保形式
- 2安全生产事故案例分析:案例4及练习
- 32015年监理工程师考试合同管理练习题(49)
- 4苗木养护工程施工组织设计
- 5景观工程施工组织设计30p
- 6一级建造师工程经济复习要点:存货总成本
- 7海南8个重点公路建设项目 总投资约280亿
- 8安全工程师《安全生产管理》第四讲讲义精选(4)
- 92015年招标师法律法规高频考点:投标保证金的提交
- 10天津2015年的招标师考试培训
- 112015年咨询工程师《工程项目组织与管理》每日一练9.3
- 12PMP认证考试练习题及参考答案(三十八)
- 13闻异常气味判断混凝土搅拌车故障
- 14造价工程师复习资料:融资谈判阶段的主要工作
- 15《项目决策分析与评价》知识点:项目目标
- 162015年一级建造师考试《法规及相关知识》冲刺习题(16)
- 17工程档案不需移交城建档案管理部门,暂由建设单位保管的有
- 18混凝土泵的工作方式
- 192008年监理工程师《质量、投资、进度控制》习题26
- 20钢筋出厂质量合格证的验收内容是什么
- 21项目管理与招标采购第三章:特种设备管理的范围
- 2209年注册安全工程师事故案例分析模拟试题(四十一)
- 23一级建造师管理与实务复习要点:减水剂
- 24某市政雨水管道工程施工组织设计
- 252015年咨询工程师《工程项目组织与管理》每日一练4.21
- 26淮南市多措并举推动美好乡村建设产业发展
- 27招标师考试《招标采购案例分析》资料(6)
- 28“十二五”我国将易地扶贫搬迁240万人
- 292015年咨询工程师《工程项目组织与管理》每日一练12.23
- 30【招标师考试】项目管理与招标采购第五章(汇总)
成都公司:成都市成华区建设南路160号1层9号
重庆公司:重庆市江北区红旗河沟华创商务大厦18楼